Extended Well Testing (EWT) / Early Production Facility (EPF)

  1. Home
  2. »
  3. Extended Well Testing (EWT) / Early Production Facility (EPF)

Services

Extended Well Testing (EWT) / Early Production Facility (EPF)

We deliver modular, scalable EWT / EPF systems that enable operators to generate early cash flow while acquiring valuable reservoir data.

Our offering includes:

  • Design, fabrication, and operation of mobile EPF units
  • Full three-phase separation, storage, and metering systems
  • Integration with existing field or export infrastructure
  • Commercial flexibility — lease, buy-back, or JV models

 

Our EPFs are engineered for rapid deployment, 98 % uptime, and easy scalability as production ramps up.

Request this Service

Get in touch for an enquiry about this service, click the button below